|
A.C.P weighted down with objects |
Well as you are aware, we had fabricated the frame work whilst awaiting the adhesive on the rear apron to set. So I don't have any pictures of this part even though it is basically a square frame and is measured to fit the rear recess that accesses the engine bay. I did how ever welded in some supports where the two locking handles were to be fitted, these locking handles and the gas struts were purchased through eBay and at a good price, the piano hinge was sourced through the local hardware store. Once I had the main frame welded up and checked for square (very important) I then did some prep work on the welds, like grinding them flat where the A.C.P was to be secured, again I use sikaflex to secure it down and used objects to apply even weight all over the