Inside the naked frame |
The rear end cut off |
Rear appron sitting in place |
Some rust treatment |
Ready for some frame work |
Rear engine waiting clean up |
Close up of the Isuzu 6BD1 engine |
Appron sitting on new rear frame section |
About a week into it & door off !!!! |
Another angle of rear |
Our daughter ready to work !!!!! |
Part of the work station |
Rear section that we cut off |
Too rusted |
From rear looking forward |
The front end |
Drivers side |
Large slide out will be in this section |
Large 400lt diesel tank fitted |
Our son watching dad work |
Rust out |
Will replace oil cooler & radiator |
Apron taken off for full welding and prep |
The welder all set up ready |
Some new frame work |
All tacked in |
Starting to look good again |
Window dummy fit |
Added some bracing |
Rubbish piles up quick |
Top half of rear |
All prep and primed in Metalfix |
From the inside |
The rear side has been welded, prep and primed |
Drivers rear taking shape too |
One roll of two |
Roll of alloy sheet |
Removing the air con system |
More removal |
Still have main unit to remove |
prefabricated out riggers and drivers side parts |
Insulation to be sandwiched between the walls |
Rear window sheeted in |
Vents to be installed underneath this sheet |
Sheet from the inside view |
Protective cover removed |
The size of the alloy against the rig |
Another piece fitted |
A sheet of 4mm a.c.p |
Rear engine door fabricated |
Sheeting applied |
Slide out bed starting to take shape |
Sheeting weighted down for firm/flat adhesive |
Linear slide bearings |
Slide out bed base |
Linear motor to operate the bed |
A few more welds needed |
Temp fitment of locks |
View of completed engine door |
Gas struts fitted |
Test fit and alignment |
Tested with a couple of rivets |
Close up once finished |
Fitment of top rear lights |
No comments:
Post a Comment